City of Akron Rubber City Heritage Trail Phase 3
Description
This project includes upgrades to the Rubber City Heritage Trail in the City of Akron, including pavement reconstruction as well as the addition of the following ITS elements: (1) Wayfinding signage and (2) HAWK Pedestrian Signal. The HAWK pedestrian signal will be added at the trailhead start, which intersects with East Exchange Street.
Status: Future
Timeframe: Medium
Stakeholders
| City of Akron Engineering Bureau |
|---|
| Driver |
|---|
| General Public |
|---|
Inventory
| City of Akron Traffic Operations Center |
|---|
| City of Akron Traffic Signal Roadway Equipment |
|---|
| Cyclists |
|---|
| Drivers |
|---|
| Pedestrians |
|---|
Services
| VS12–Pedestrian and Cyclist Safety (City of Akron Rubber City Heritage Trail Phase 3) |
|---|
Interfaces
| Source | Flow | Destination | Status |
|---|
| City of Akron Traffic Operations Center | mixed use safety warning control | City of Akron Traffic Signal Roadway Equipment | Future |
|---|
| City of Akron Traffic Signal Roadway Equipment | crossing permission | Cyclists | Future |
|---|
| City of Akron Traffic Signal Roadway Equipment | crossing permission | Pedestrians | Future |
|---|
| City of Akron Traffic Signal Roadway Equipment | driver information | Drivers | Future |
|---|
| City of Akron Traffic Signal Roadway Equipment | mixed use safety warning status | City of Akron Traffic Operations Center | Future |
|---|
| Cyclists | crossing call | City of Akron Traffic Signal Roadway Equipment | Future |
|---|
| Pedestrians | crossing call | City of Akron Traffic Signal Roadway Equipment | Future |
|---|