City of Akron Rubber City Heritage Trail Phase 3
Description
This project includes upgrades to the Rubber City Heritage Trail in the City of Akron, including pavement reconstruction as well as the addition of the following ITS elements: (1) Wayfinding signage and (2) HAWK Pedestrian Signal. The HAWK pedestrian signal will be added at the trailhead start, which intersects with East Exchange Street.
Status: Future
Timeframe: Medium
Stakeholders
City of Akron Engineering Bureau |
---|
Driver |
---|
General Public |
---|
Inventory
City of Akron Traffic Operations Center |
---|
City of Akron Traffic Signal Roadway Equipment |
---|
Cyclists |
---|
Drivers |
---|
Pedestrians |
---|
Services
VS12–Pedestrian and Cyclist Safety (City of Akron Rubber City Heritage Trail Phase 3) |
---|
Interfaces
Source | Flow | Destination | Status |
---|
City of Akron Traffic Operations Center | mixed use safety warning control | City of Akron Traffic Signal Roadway Equipment | Future |
---|
City of Akron Traffic Signal Roadway Equipment | crossing permission | Cyclists | Future |
---|
City of Akron Traffic Signal Roadway Equipment | crossing permission | Pedestrians | Future |
---|
City of Akron Traffic Signal Roadway Equipment | driver information | Drivers | Future |
---|
City of Akron Traffic Signal Roadway Equipment | mixed use safety warning status | City of Akron Traffic Operations Center | Future |
---|
Cyclists | crossing call | City of Akron Traffic Signal Roadway Equipment | Future |
---|
Pedestrians | crossing call | City of Akron Traffic Signal Roadway Equipment | Future |
---|