City of Akron Rubber City Heritage Trail Phase 3

Description

This project includes upgrades to the Rubber City Heritage Trail in the City of Akron, including pavement reconstruction as well as the addition of the following ITS elements: (1) Wayfinding signage and (2) HAWK Pedestrian Signal. The HAWK pedestrian signal will be added at the trailhead start, which intersects with East Exchange Street.

Status: Future

Timeframe: Medium

Stakeholders

City of Akron Engineering Bureau
Driver
General Public

Inventory

City of Akron Traffic Operations Center
City of Akron Traffic Signal Roadway Equipment
Cyclists
Drivers
Pedestrians

Services

VS12–Pedestrian and Cyclist Safety (City of Akron Rubber City Heritage Trail Phase 3)

Interfaces

SourceFlowDestinationStatus
City of Akron Traffic Operations Centermixed use safety warning controlCity of Akron Traffic Signal Roadway EquipmentFuture
City of Akron Traffic Signal Roadway Equipmentcrossing permissionCyclistsFuture
City of Akron Traffic Signal Roadway Equipmentcrossing permissionPedestriansFuture
City of Akron Traffic Signal Roadway Equipmentdriver informationDriversFuture
City of Akron Traffic Signal Roadway Equipmentmixed use safety warning statusCity of Akron Traffic Operations CenterFuture
Cyclistscrossing callCity of Akron Traffic Signal Roadway EquipmentFuture
Pedestrianscrossing callCity of Akron Traffic Signal Roadway EquipmentFuture