City of Akron North Main Street Complete Streets

Description

This project includes various upgrades to the North Main Street corridor in the City of Akron, including roadway improvements (i.e., pavement reconstruction) as well as the addition of the following ITS elements: (1) Traffic signals (upgrades to signal equipment and coordination/ interconnecting of signals), (2) Wayfinding signage, and (3) Fiber optic cable. Fiber Optic lines are proposed to create the backbone of the future implementation of Smart City technology along the corridor (PID# 112716).

Status: Planned

Timeframe: Short (2025)

Stakeholders

City of Akron Engineering Bureau

Inventory

City of Akron Traffic Operations Center
City of Akron Traffic Signal Roadway Equipment

Services

TM03–Traffic Signal Control (City of Akron North Main Street Complete Streets)

Interfaces

SourceFlowDestinationStatus
City of Akron Traffic Operations Centersignal control commandsCity of Akron Traffic Signal Roadway EquipmentPlanned
City of Akron Traffic Operations Centersignal control device configurationCity of Akron Traffic Signal Roadway EquipmentPlanned
City of Akron Traffic Operations Centersignal control plansCity of Akron Traffic Signal Roadway EquipmentPlanned
City of Akron Traffic Operations Centersignal system configurationCity of Akron Traffic Signal Roadway EquipmentPlanned
City of Akron Traffic Operations Centertraffic detector controlCity of Akron Traffic Signal Roadway EquipmentPlanned
City of Akron Traffic Signal Roadway Equipmentright–of–way request notificationCity of Akron Traffic Operations CenterPlanned
City of Akron Traffic Signal Roadway Equipmentsignal control statusCity of Akron Traffic Operations CenterPlanned
City of Akron Traffic Signal Roadway Equipmentsignal fault dataCity of Akron Traffic Operations CenterPlanned
City of Akron Traffic Signal Roadway Equipmenttraffic detector dataCity of Akron Traffic Operations CenterPlanned