Interface: Summit County Sheriff Dispatch - Summit County Maintenance Dispatch

Summit County Sheriff Dispatch to Summit County Maintenance Dispatch Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Existing)  Selected Comm Solution

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

maint and constr resource request  (Existing)  Selected Comm Solution

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  Selected Comm Solution

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Existing)  Selected Comm Solution

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

roadway maintenance status  (Existing)  Selected Comm Solution

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

transportation system status  (Future)  Selected Comm Solution

Current status and condition of transportation infrastructure (e.g., tunnels, bridges, interchanges, TMC offices, maintenance facilities). In case of disaster or major incident, this flow provides an assessment of damage sustained by the surface transportation system including location and extent of the damage, estimate of remaining capacity and necessary restrictions, and time frame for repair and recovery.

work plan feedback  (Existing)  Selected Comm Solution

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.

work zone information  (Future)  Selected Comm Solution

Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.